Back home  |  Email Login  |  中文
Production Base

Production base overview

RESOURCE HYDRO, located in Hangzhou Dajiangd ...

Component Workshop

The component workshop can manufacture large ...

Metalworking and Assembling Workshop

The metalworking and assembling workshop is ...

Electrical Coil Workshop

The electrical coil workshop is mainly engag ...

Casting Workshop

Our casting workshop has a long history and ...

Physical and Chemical Lab

1. The chemical lab and mechanical lab are s ...

  • Techinque
  • Production
  • Quality
  • Partner
  • Honor

The technical center of Hangzhou Resource Power Equipment Co., Ltd. has 6 professor-level senior engineers, 36 senior engineers, and more than 120 other professional technical engineers, mainly from the original Kvarner (Hangzhou) Power Generation Equipment Co., Ltd. and GE Asia Hydropower Equipment Co., Ltd., Andritz Hydropower Equipment Co., Ltd. and other domestic and foreign medium and large hydropower equipment companies...

Main business
  • Spherical Valve

    Design and production capacity
    Maximum water head: ≤ 1000m
    Diameter: ≤ 4.0m

  • Generator

    Unit capacity: ≤300MW
    Voltage class: ≤18.0kV

  • Pelton Turbine

    Design and production capacity
    Unit Output : ≤200MW
    Maximum water head: ≤1000m

  • Bulb Tubular Turbine

    Design and production capacity
    Unit Output : ≤60MW
    Runner diameter : ≤9.0m
    Rated head : 2m~30m

  • Kaplan Turbine

    Design and production capacity
    Unit Output : ≤150MW
    Runner diameter : ≤9.0m
    Rated head : 5m~50m

  • Francis Turbine

    Design and production capacity
    Unit Output : ≤300MW
    Runner diameter : ≤8.0m
    Rated head : 20m~700m

Copyright@2016 Hangzhou Resource Power Equipment Co., Ltd. all rights reserved
No.2688 Weiwu Rd. Linjiang High-Tech Park, Hangzhou Qiantang New Area.China E-mail